مراقب عام |
|
اشترك في: الاثنين إبريل 05, 2010 7:23 pm |
مشاركات: 13047 | مكان: المنصورة |
|
السلام عليكم ورحمة الله تعالى وبركاته
إسكارف وقفاز وقبعة تريكو بالباترون للأنسات مكملات الأناقه
Knitted mittens, hat and scarf with textured pattern pompoms
HAT: Size: One-size Materials: 100 g colour no 0500, light grey And use:50 g colour no 21, off white
DOUBLE POINTED NEEDLES and CIRCULAR NEEDLE (40 cm) SIZE 4.5 mm - or size needed to get 18 sts x 23 rows in stocking st = 10 x 10 cm. CIRCULAR NEEDLE (40 cm) SIZE 3.5 mm – for rib.
SCARF: Measurements: approx. 26 cm wide x 150 cm long. Materials: 300 g colour no 0500, light grey And use:50 g colour no 21, off white
STRAIGHT NEEDLES SIZE 5.5 mm - or size needed to get 16 sts x 20 rows in stocking st = 10 x 10 cm.
MITTENS: Size: One-size Materials: 100 g colour no 0500, light grey
DOUBLE POINTED NEEDLES SIZE 4.5 mm - or size needed to get 18 sts x 23 rows in stocking st with Nepal = 10 x 10 cm. DOUBLE POINTED NEEDLES SIZE 3.5 mm – for rib
PATTERN: See diagram A-1 for hat and mittens, and A-2 and A-3 for scarf. Diagrams show 1 repetition of pattern. ----------------------------------------------------------
HAT: Worked in the round. Cast on 84 sts on circular needle size 3.5 mm with Nepal. K 1 round, then work 6 rounds rib = K 2/P 2. Switch to circular needle size 4.5 mm, then work diagram A-1 (= 7 repetitions on the round). REMEMBER THE KNITTING TENSION! When A-1 has been worked, 28 sts remain on needle, work 1 round where all sts are K tog 2 by 2 = 14 sts. Cut the thread and pull it through the remaining sts and tighten tog.
POMPOM: Make 1 large, dense pompom with Vienna with an approx. diameter of 10 cm. Sew the pompom at the top of the hat. ----------------------------------------------------------
SCARF: Worked in 2 parts back and forth on needle and sewn tog in the middle when finished. Cast on 5 sts on needle size 5.5 mm with Nepal. Work and inc according to diagram A-2 (1st row = WS). When A-2 has been worked, there are 43 sts on needle and piece measures approx. 20 cm. Continue as follows (1st row = WS): 3 sts in garter st, A-3 three times in breadth, then work first st in A-3 one more time and work the last 3 sts in garter st. REMEMBER THE KNITTING TENSION! Repeat A-3 until piece measures approx. 75 cm – finish after one whole pattern border, then K 2 rows over all sts. Put piece aside and knit another part.
ASSEMBLY: Sew the 2 parts tog with grafting/kitchener sts.
POMPOMS: Make 2 large, dense pompoms with Vienna with an approx. diameter of 8 cm. Fasten 1 pompom in each end of scarf. ----------------------------------------------------------
MITTEN: Worked in the round on double pointed needles. Cast on 36 sts on double pointed needles size 3.5 mm with Nepal, K 1 round then work rib = K 2/P 2 for 10 cm. Work next round as follows: * K 2 tog, 1 YO *, repeat from *-* the rest of round. Switch to double pointed needles size 4.5 mm, then work diagram A-1 (= 3 repetitions on the round). REMEMBER THE KNITTING TENSION! Insert a marker in first st on round (= thumb st). When A-1 has been worked for 2 cm, beg inc for thumb gusset. Inc on each side of thumb st by making 1 YO, on next round K YOs twisted. Repeat inc every other round 3 more times - inc on each side of all thumb sts every time, i.e. next time inc on each side of 3 sts, then 5 sts etc. – work the inc sts in stocking st. After all inc, there are 9 thumb sts and 44 sts in total. When A-1 has been worked for 6 cm, slip the 9 thumb sts on a stitch holder and cast on 1 new st over stitch holder = 36 sts. Work until A-1 is finished, 12 sts now remain on needle. Work 1 round where all sts are K tog 2 by 2 = 6 sts. Cut the thread and pull it through the remaining sts and tighten tog.
THUMB: Slip sts from stitch holder over thumb gusset on double pointed needles size 4.5 mm and knit in addition up 3 sts along the edge behind the thumb = 12 sts. Work in stocking st for 5 cm, then K all sts tog 2 by 2 = 6 sts. Cut the thread and pull it through the remaining sts and tighten tog.
Knit another mitten.
|
|