مراقب عام |
|
اشترك في: الاثنين إبريل 05, 2010 7:23 pm |
مشاركات: 13047 | مكان: المنصورة |
|
بسم الله الرحمن الرحيم
بوت تريكو بزراير جانبية للبنات شيك جدا بالباترون
Knitted slippers in 2 threads
Size: 35/37 - 38/40 - 41/43 Foot length: 22 - 24 - 27 cm Materials:Colour no 01, off white: 100 g for all sizes Colour no 02, beige: 100 g for all sizes And use:Colour no 47, light beige: 100-100-150 g
CIRCULAR NEEDLE SIZE 8 mm (60 cm) - or size needed to get 13 sts x 26 rows in garter st with 2 threads Symphony = 10 x 10 cm. STRAIGHT NEEDLES SIZE 6 mm - or size needed to get 13 sts x 26 rows in garter st with 1 thread Eskimo = 10 x 10 cm. WOOD BUTTON COCONUT, NO 516: 8 pieces for all sizes
MEASURING TIP: Measure when piece is flat, it is important not to stretch the piece when measuring. --------------------------------------------------------
LEFT SLIPPER: Worked back and forth on needle in garter st, i.e. K all rows. Cast on 28-31-35 sts on needle size 6 mm with 1 thread Eskimo. Insert 1 marker after 22-24-26 sts seen from RS (6-7-9 sts = toe). Then K back and forth on needle (1st row = RS), but on every 4th row (i.e. every other row from RS), turn before marker so that there are fewer rows on toe. NOTE: Tighten the thread a little extra when turning in the middle of row to avoid holes. Continue like this back and forth until piece measures 8-9-10 cm (measured at the widest). On the next row from RS, cast off the first 14-16-17 sts = 14-15-18 sts remain on needle. Continue as before back and forth over these sts until piece measures approx. 2-2-3 cm from where the sts where cast off (measured at the widest). Now cast on 14-16-17 new sts at the end of next row from WS = 28-31-35 sts. Insert 1 marker after 7-8-8 sts seen from RS (knit up for leg here). Continue back and forth as before until piece measures 8-9-10 cm from where the new sts were cast on, loosely cast off.
ASSEMBLY: Pull a thread through the front loop of every st on the toe, tighten tog and fasten the thread. Start at the end of toe and sew the slipper tog edge to edge in front loop of outermost sts under foot and continue up the back of heel to avoid a chunky seam.
LEG: Worked back and forth on needle. Knit up new sts for leg with 1 thread in each colour Symphony on circular needle size 8 mm along the opening of slipper as follows: Beg at marker (mid in the side), knit up from RS in front loop of outermost sts approx. 30 - 40 sts around the entire opening - move the marker to beg of row from RS - knit up band here. K next row - while AT THE SAME TIME adjusting no of sts to 30-34-38. Continue in garter st until leg measures 20-21-22 cm. On next row from RS switch to needle size 6 mm and 1 thread Eskimo - AT THE SAME TIME work rib as follows: * K 2, P 2 *, repeat from *-* and finish with K 2. Continue like this until rib measures approx. 2 cm, cast off with K over K and P over P. Leg measures approx. 22-23-24 cm vertically.
BAND: Knit up new sts for band in the side along the leg as follows: With 1 thread Eskimo on needle size 6 mm, knit up from RS (beg at the bottom of leg from marker) approx. 30 - 40 sts in front loop of outermost sts along the entire leg edge. On next row from WS, P while AT THE SAME TIME adjusting no of sts to 34-38-38. On next row from RS work rib as follows: 2 edge sts in garter st, * K 2, P 2 *, repeat from *-*, finish with K 2 and 2 edge sts in garter st. Continue like this until rib measures approx. 2 cm, loosely cast off with K over K and P over P.
ASSEMBLY: Fasten the band as follows: Place edge A (= edge where band in Eskimo was knitted) over edge B (= edge without band) - see diagram, fasten band on leg with little stitches. Sew on 4 buttons on band through all layers.
RIGHT SLIPPER: Cast on and work as left slipper but reversed.
|
|