مراقب عام |
 |
اشترك في: الاثنين إبريل 05, 2010 7:23 pm |
مشاركات: 13047 | مكان: المنصورة |
|
بونشو تريكو بناتى بكابتشو وحواف من الكروشيه بالباترون
بسم الله الرحمن الرحيم
Knitted poncho with textured pattern and hood Pompoms and crochet edges



Size: 3/4 - 5/6 - 7/8 - 9/10 - 11/12 years Size in cm: 98/104 - 110/116 - 122/128 - 134/140 - 146/152 Materials: 300-350-400-450-500 g colour denim blue And use:50 g for all sizes in colour beige
DOUBLE POINTED NEEDLES and CIRCULAR NEEDLE (60 cm) SIZE 5 mm - or size needed to get 17 sts x 22 rows in stocking st = 10 x 10 cm. CROCHET HOOK SIZE 5 mm - for edges.
GARTER ST (back and forth on circular needle): 1 ridge = 2 rows K.
PATTERN: See diagram A-1 to A-3. Diagrams show pattern from RS. ----------------------------------------------------------
PONCHO: Worked in the round on circular needle from bottom up. Cast on 156-168-180-192-204 sts on circular needle size 5 mm with Nepal. Insert a marker at beg of round (= the side). Work diagram A-1 (= 13-14-15-16-17 repetitions on the round). REMEMBER THE KNITTING TENSION! After A-1, continue with A-2 until piece measures 20-23-26-29-32 cm. Then work and dec according to A-3 – AT THE SAME TIME on last round of A-3 dec 2-4-6-8-10 sts evenly. When A-3 has been worked, 76-80-84-88-92 sts remain on needle and piece measures approx. 30-33-36-39-42 cm vertically. K 19-20-21-22-23 sts. It has now been worked until mid front - now rounds beg here. Work next round as follows: * K 2 tog, 1 YO *, repeat from *-* the entire round. P 1 round and K 1 round. Continue with hood.
HOOD: Worked back and forth on circular needle from mid front as follows: 4 sts in GARTER ST - see explanation above. A-2 until 4 sts remain, work these in garter st. Continue like this until hood measures 22-24-26-28-30 cm vertically, then work 4 rows in garter st over all sts. Cast off, place hood double and sew tog at the top.
CROCHET EDGES: Work around the opening at the front of hood and at the bottom of poncho with Symphony on hook size 5 mm as follows: 1 dc in first st, * 3 ch, skip 1 st / 2 rows in garter st, 1 dc in next st *, repeat from *-* the entire round and finish with 1 sl st in first dc.
TIE AND TASSELS: Cut 3 threads in Nepal of approx. 2.5 metres, twine the hard, fold them double and they will twine again. Make a knot at each end. Thread the tie in the row with eyelet holes at the top of poncho – start mid front. Make 2 dense pompoms with Nepal with an approx. diameter of 5 cm. Fasten one pompom in each end of tie around the neck.



|
|