كوت تريكو بناتى للبيبى بالباترون
الباترون المرسوم
http://parijanka.info/detskie-modeli/in ... ildar-3072
Coat (e) 18 * 74 Phildar
Dimensions: 3 months - 6 months - 12 months - 18 months - 24 months
Yarn (number of coils)
Yarn
Color
3 months
6 months
12 months
18 months
24 months
Partner 6
Pronostic
Brume
5
6
7
7
8
Dragee
Fuchsia
Quetsche
remains
Composition: 50% polyamide , 25% wool, 25% acrylic, 50 g / m 66
Materials
Spokes number 4 and 5 (fit loosely, and then sits down)
Spokes number 3
Gypsy needle
Markers
Spoke-pin
Zipper length 25 cm - 25 cm - 30 cm - 30 cm - 30 cm
Patterns and mating
The front surface of
Garter
The increase of 1 point to the edge
Simple tog for 1 item to the edge
Right: Knit 1 individuals., 2 persons together.
Left: knit to last 3 sts, 1 simple broach (remove one item on dop.spitsu, k1., throw the removed item to knit), k1.
Sample
Square with sides of 10 cm faces. smooth surface of the spokes of the number 5 = 16 p and 24 p.
Performance
Back
Dial 52 - 56 - 58 - 62 - 66 sts on needle number 5, knit individuals. stitch, subtracting each. Sided. for the 1 st to the edge:
3 months: in each. 6 p. 5x1 sts, 4 p. 1x1 section above
6 months: 8 p. 1x1 above paragraph and in each. 6 p. 5x1 p
12 months: in each. 8 p. 3x1 section and in each. 6 p. 3x1 p
18 months: in each. 8 p. 4x1 section in each. 6 p. 2x1 p
24 months: in each. 8 p. 5x1 section and in each. 6 p. 1x1 p
The remaining 40 - 44 - 46 - 50 - 54 p
At a height of 16 cm (38 p.) - 18 cm (44 p.) - 20 cm (48 p.) - 21 cm (50 p.) - 22 cm (52 p.) To form the armhole, closing with everyone. Sided. in kazhd.2 p. 2x2 and 1x1 p n
The remaining 30 - 34 - 36 - 40 - 44 p
At a height of 27 cm (66 p.) - 30 cm (72 p.) - 33 cm (80 p.) - 35 cm (84 p.) - 37 cm (90 p.) To form shoulders, closing with ppm. armholes in each. 2 p.:
3 months: 1x3 and 1x4 p n
6 months: 2x4 section
12 months: n 1x4 and 1x5 section
18 months: 2x5 section
24 months: n 1x5 and 1x6 section
At the same time form a neck, covering 16 - 18 - 18 - 20 - 22 area. sts on both sides separately.
Right front
Dial 43 - 45 - 46 - 48 - 50 sts on needle number 5, knit individuals. stitch, dec 1 st at the left to the edge:
3 months: in each. 6 p. 5x1 sts, 4 p. 1x1 section above
6 months: 8 p. 1x1 above paragraph and in each. 6 p. 5x1 p
12 months: in each. 8 p. 3x1 section and in each. 6 p. 3x1 p
18 months: in each. 8 p. 4x1 section in each. 6 p. 2x1 p
24 months: in each. 8 p. 5x1 p and 6 p. 1x1 section above
Simultaneously at a height of 9 cm (22 p.) - 10 cm (24 p.) - 11 cm (26 p.) - 11.5 cm (28r.) - 12 cm (30 p.) Knit trail. follows: Section 2 first, then fantasy pattern (sm.shemu), 11 p stitch, close the trail. Section 16 (crease), to finish the series.
It remains 21 - 23 - 24 - 26 - 28 p
Continue fantasy pattern for the first 12 - 12 - 12 - 15 - 15 sts and individuals. flatly on the east. §
At a height of 16 cm (38 p.) - 18 cm (44 p.) - 20 cm (48 p.) - 21 cm (50 p.) - 22 cm (52 p.) To form the armhole, closing the left kazhd.2 p. 2x2 and 1x1 p n
There are 16 - 18 - 19 - 21 - 23 p
At a height of 25 cm (60 p.) - 27 cm (66 p.) - 30 cm (72 p.) - 31 cm (74 p.) - 33 cm (80 p.) To form the neck, closing right at each. 2 p.:
3 months: 2x3 section, paragraph 1x2, 1x1 p
6 months: 1x4 section, paragraph 1x3, 1x2 p, n 1x1
12 months: n 1x4, 1x3 p, n 1x2, 1x1 p
18 months: n 1x4, 1x3 p, n 1x2, 2x1 p
24 months: n 1x4, 1x3 p, n 2x2, 1x1 p
At a height of 27 cm (66 p.) - 30 cm (72 p.) - 33 cm (80 p.) - 35 cm (84 p.) - 37 cm (90 p.) To form shoulders, closing with ppm. armhole each. 2 p.:
3 months: 1x3 and 1x4 p n
6 months: 2x4 section
12 months: n 1x4 and 1x5 section
18 months: 2x5 section
24 months: n 1x5 and 1x6 section
Knit the left front part is symmetric.
Sleeves
Dial 30 - 30 - 32 - 34 - 36 sts on needle number 4, knit garter 1.5 cm (6 p.). = 3 strips.
Continue on the needles stitch number 5, up to anyone. hand for 1 item to the edge:
3 months: in each. 8 p. 3x1 p
6 months: in each. 8 p. 4x1 p
12 months: in each. 8 p. 4x1 section and in each. 6 p. 1x1 p
18 months: in each. 8 p. 4x1 section and in each. 6 p. 2x1 p
24 months: in each. 8 p. 5x1 section and at 6 p. 1x1 p
It turns out 36 - 38 - 42 - 46 - 48 p
At a height of 13.5 cm (32 p.) - 15.5 cm (38 p.) - 18.5 cm (44 p.) - 20.5 cm (50 p.) - 21.5 cm (52 p. ) after the garter form doused sleeves, closing with everyone. Sided. each. 2 p.:
3 months: 2x3 section, paragraph 1x2, 1x1 p, n 1x3
6 months: 2x3 forth, 2x2 p, n 1x3
12 months: n 1x4, 1x3 p, 1x2 p. 2x3 p
18 months: n 1x4, 3x3 p, n 1x4
24 months: n 2x4, 2x3 p, n 1x4
At a height of 17.5 cm (42 p.) - 19.5 cm (48 p.) - 22.5 cm (54 p.) - 24.5 cm (60 p.) - 25.5 cm (62 p. ) after the close garter st. 12 items
Knit second sleeve as well.
Hood
Dial 66 - 70 - 72 - 72 - 72 sts on needle number 4, knit in garter stitch 1 cm (4 p.) = 2 strips.
Continue to stitch on the needles number 5.
At a height of 6 cm (14 p.) - 7 cm (18 p.) - 7 cm (18 p.) - 9 cm (22 p.) - 10 cm (24 p.) After the garter close to anyone. Sided. each. 2 p.:
3 months: 6x2 forth, 6x3 p
6 months: 5x2 forth, 7x3 p
12 months: n 5x2, 7x3 p
18 months: n 5x2, 7x3 p
24 months: n 5x2, 7x3 p
Remains 6 - 8 - 10 - 10 - 10 n
At a height of 16 cm (38 p.) - 17 cm (42 p.) - 17 cm (42 p.) - 19 cm (46 p.) - 20 cm (48 p.) After the garter mark colored thread edge section and then add each. Sided. for the 1 st to the edge:
3 months: in each. 8 p. 5x1 p
6 months: in each. 8 p. 5x1 p
12 months: in each. 10 p. 2x1 section in each. 8 p. 3x1 p
18 months: in each. 10 p. 2x1 section in each. 8 p. 3x1 p
24 months: in each. 10 p. 2x1 section in each. 8 p. 3x1 p
At a height of 36.5 cm (86 p.) - 38 cm (92 p.) - 38.5 cm (94 p.) - 40.5 cm (98 p.) - 41.5 cm (100 p.) After close garter st. 16 - 18 - 20 - 20 - 20 n
Assembly
Been stripped of product. Sew the folds in the WS. side. Run the shoulder, side seams and sleeve seams. Sew sleeves to armhole. Sew hood and sew it around the neck.
Sew the zipper:
3 months: the edge
6 months: leaving a free margin of 1 cm from the top and bottom
12 months: the edge
18 cm leaving a free 1 cm above
24 months: free leaving 1 cm above and 2 cm from the bottom.
Hearts
Weave pigtail length of 10 cm 3 of thread colors Brume. Weave 2 more of these braids.
Dial 12 sts on needle number 3 color Dragee, 4.5 cm knit stitch (14 p.), Close the section
Assign another 2 squares of color Fuchsia and Quetsche. Close diagonal squares (see scheme) round sharp parts on both sides of the diagonal. Sew one of the pigtail to acute heart, to hide all the threads inside, pass a string in the middle and pull it, making the shape of a heart. Pigtails with hearts sewn to the top of the hood.